EUR: 105,81
$
USD: 100,22

Инструкция по эксплуатации Cehisa PRO 12 на Английском.

manual-pro-12-eng

INSTRUCTIONS MANUAL EDGE BANDING MACHINE OF HOT-MELT GLUE

рис 1 

TECHNICAL ESPECIFICATION:

 

 

 

CR-1

THICKNESS BOARD

MÍN.

MAX

8 mm

60 mm

10 mm

40 mm

WIDE BOARD

MIN.

75 mm

 

LONGITUDE BOARD

MÍN.

120 mm

150 mm

THICKNESS EDGING

MAX.

3 mm  (* 5 mm Solid Wood OPTION)

 

DRAG CHAINE SPEED

2 speed

9-14 m/mi

9 m/mi

  ELECTRIC CONNECTION:

 END TRIMMING STATION:  V-7  MOTOR:                          2 x 0.35 Kw

 TRIMMING STATION:          JC-5                           BC-5 MOTOR:                          2 x 0.35 Kw            OPTIONAL (2 x 0.55 Kw)

 CORNER ROUNDING STATION:          CR-1 MOTOR:                          0.27 Kw

 RADIUS SCRAPE UNIT:      RB-8

 FLAT SCRAPE UNIT:          RR-7  (OPTIONAL)

 

POLISHER STATION:         PC-9 MOTOR:                         2 x 0.09 Kw

 DRAG UNIT GEAR MOTOR:               1.5 Kw

 PREMILLING STATION: PF-12 MOTOR:                           2 x 1.5 Kw

                  EDGEBANDER MACHINE PRO-12 SERIES   Serial Nº:

 

Considered a machine according to the Machine Regulation 2006/42/CE. Technical File in: CEHISA, C-59, km 17.2, E-08140 Caldes de Montbui – Barcelona                      D. Manuel Cuenca

And to which this declaration refers, fulfils the following regulations or regulatory documents.

 

EN 14121:2007;

EN 60204-1:1999;

EN 13849-1:2008;

EN 953: 1998;

EN 1088: 1996;

EN 13850:2007

 The product described herein fulfils the following European Regulation:

 2006/95/CE Low Tension Regulation

2004/108/CE CEM Regulation

2006/42/CE Machine Regulation

1      Introduction: 1

1.1      Purpose of the operating manual: 1

1.2      Presentation: 1

1.3      Reference standards: 1

1.4      General warnings and recommendations: 1

1.5      Technical specifications: 2

2      MACHINE Installation: 3

2.1      General safety rules at the PRO series edge banding machine installation: 3

2.2      Limits of use: 3

2.3      Machine movement and sitting: 4

2.4      Dimensions and safety zones: 5

2.5      Electrical installation: 5

2.6      Pneumatic installation: 7

2.7      Fitting the roll-holder tray: 7

2.8      Fitting the apron: 8

3      Setting up and starting the machine: 8

3.1      Control devices on the button panel: 8

3.2      Start-up and stop the machine. 9

3.3      Adjusting presser height: 9

3.4      Loading and regulating the band in roll form: 9

3.5      Regulating surplus strip: 10

4      Working stations: 11

4.1      PREMILLING STATION PF-12. 11

4.1.1       Depth regulation of the pre-trimming: 11

4.1.2       Adjusting the motor’s premilling: 11

4.1.3       Adjustment of the first motor: 11

4.1.4       Adjustment of the second motor: 11

5      Working stations: 12

5.1      Glue pot station: 12

5.1.1       Dispensing glue: 12

5.1.2       Glue level in the tank: 12

5.1.3       Setting up for correct gluing: 12

5.1.4       Replacing heating resistances: 13

5.1.5       Security: 15

5.2      Roller base: 16

5.2.1       Security: 16

5.3      V-7 end trimming station: 17

5.3.1       Pneumatic regulation: 17

5.3.2       Security. 17

5.3.3       Safety systems: 18

5.3.4       Working limits: 18

5.3.5       Mechanical regulation: 18

5.3.6       Replacing the end trimmer discs: 19

5.4      Trimming station JC-5: 20

5.4.1       Adjustment with flat cutters: 20

5.4.2       Replacing cutters: 20

4.5 Security. 20

6      cORNER ROUNDING STATION cr-1. 22

6.1      Operation: 26

6.2      Adjusting the front tracer: 26

6.3      Ajustment of working pressure: 26

6.4      Changing of cutter: 26

6.5      Radius Scraper station RB-8: 27

6.6      Flat Glue Scraper (Option) 30

6.6.1       Glue scraper adjustment 30

6.6.2       Regulation of the tracing tension. 30

6.6.3       Scraping depth regulation. 30

6.6.4       Disengagement of the glue scraper unit 30

6.7      Polisher station PC-9: 32

7      Maintenance: 33

7.1      Routine maintenance: 33

7.2      Special maintenance: 33

8      TROUBLESHOOTING: 34

8.1      Machine does not start: 34

8.2      Irregular band feed: 35

8.3      The end trimming station moves the piece when the board is passed through it: 35

8.4      Router trimming diminishes: 35

8.5      The board moves: 36

8.6      Uneven gluing: 36

9      INVERTER parameters. 36

10        Pneumatic sketch. 38

10.1    PNEUMATIC SCKETCH NOMENCLATURE. 38

11        SPARE PARTS. 43

12        electric sCheme. 77

 

 

 

Подождите
Мы получили Ваше сообщение и в ближайшее время свяжемся с вами.